06 / DAILY OPERATIONS · OMS · SAFETY
One day.
One accountable plan.
Compare three staffed shifts. See what gets picked, what reaches handover and what the next crew inherits.
View live operations ↓Preparing the first paired day…
Local shift time06:00–14:0014:00–22:0022:00–06:00 +1
Waiting for a validated plan.
Three shifts. Continuous work.
| Shift / time | Sorter plan → picked | Classic plan → picked | Overdue picking remainder |
|---|
Every unit has an order.
Hourly waves release against a fixed manifest. Due times are the end of the planned shift. Twin gives earlier due orders precedence. Picked, handed over and truck-loaded remain separate.
| Order / zone | Release → due | Picked / requested | State / owner | Handover / loaded | Clear plan / elapsed |
|---|
Original OMS hash —
Execution task hash —
What changes when the task changes?
Run more BIN work, a balanced mix and more OUTER work against the same original OMS lines. Whole eligible cartons change carrier type. Locations, base units and order deadlines stay pinned.
Set the daily plan and staffing, then run three independent task-mix days.
Detailed task-mix table
| Mix / system | BIN / pallet tasks planned | Sorter picked / target | Unpicked | Handed over | Picked awaiting handover | Last handover | Carton work | Classic picked | Result clock |
|---|---|---|---|---|---|---|---|---|---|
| No task-mix comparison has run. | |||||||||
The experiment reassigns eligible whole packs between Bins and pallets within the same order set.
Fresh runs include the selected staffing schedule and disturbances. Live actions apply to the displayed day. OMS quantities, sources, eligibility and deadlines share one hash across all mixes. Actual share respects pack size and pallet capacity.
Who should cut the cartons?
Compare picker cutting, a station with one extra worker and a station staffed by one reassigned picker. Each run uses the same tasks and deadline. The station receives empty cartons without extra picker travel in this model.
Ready after the daily plan is validated.
Where the time goes.
Each clean trip includes safe travel, empty collection, quantity checks and delivery. The planner splits longer trips. Actual work also includes queues, carton cutting and the enabled disruptions.
A separate job.
Work and delay.
| Phase | Old system · picker-hours | Twin · picker-hours |
|---|
Three crews, one workday.
Clock labels are local. +1 marks the next date. The reference allocates 6 h 30 min in WMS, 40 min break and 50 min sign-in and sign-out per covered picker. Late handovers can shift a break. The station uses the full 8-hour staffing reference.
Shared or staggered breaks?
Both schedules assign 40 minutes per picker. Staggered breaks use three cohorts. Compare handovers, service, queue hours and time in WMS for the selected operating system.
Apply a WMS calendar to compare break schedules.
Where did the work stop?
Trace released units by stage. Select a task or carrier to highlight its recorded location and see its latest waiting intervals. Pause the run to inspect a synchronized snapshot.
Test one change.
Replay the applied plan and live commands to the inspected clock. Only the selected input changes. Results use simulated timings and identical OMS orders.
Advance and pause the day to choose a replay cutoff.
Capacity cannot bypass the rules.
Move labour, not numbers.
Transfers wait for the current load to be handed over, return the empty vehicle to staging, then travel through the existing main aisle. A central transfer permit coordinates both directions.
Test a real safety hold.
Hold vehicle movement and picking for five simulated minutes. The clock, OMS releases and stationary outbound continue. No source confirmation is credited during the hold.
No traffic hold active.
Running Twin rules are pinned.
Order releases, crew handovers & safety events
Simulation interlocks: STOP dwell, bounded travel speed, exclusive aisle/resource access and an explicit empty-vehicle transfer process. No real sensors, WMS connection, PLC commands or certified safety function are connected.
Compare the whole day.
| Measure | Old system | Digital Twin | Change |
|---|
Run the paired day to assess coverage and the remaining bottlenecks.
Daily evidence & measurements
Put timings against observations.
Daily orders, locations, traffic and capacity are simulated. Imported samples can inform stop times, Classic quantities and carrier placement. Validation rows report fit error for those components. A full-day prediction needs independent warehouse outcomes.
Reference timings are active until a plan with observations is applied.
CSV format and fitting rules
sample_id,group_id,split,phase,quantity,duration_s
- Use anonymous sample and group IDs. Give each group one split,
calibrationorvalidation. - Clean stops use
outer(cartons),bin(pieces) orclassic(pieces). Include ordinary travel from the previous stop through confirmation. Record carton cutting, queues and other interruptions outside this interval. - For
sorter_handover,classic_handover,sorter_waitandclassic_wait, use quantity 1. Handover measures one carrier placement after the slot is available. Wait rows provide a reference, while queues are generated by the simulation. - A phase needs eight calibration rows in two groups to apply a median. A stop curve also needs two distinct quantities. Within the observed range the model interpolates between medians. Other quantities use the reference range. Holdout error uses validation rows only.