K↗KASYNETSOPERATIONS / DECISION INTELLIGENCE
Engineering prototypeDaily OMS ↗
01 / THE CONNECTED SHIFT

Productivity starts before the pick.

Task design, access and traffic shape the result before a worker confirms a single piece.

Open detailed lab ↗

Starting the shared event model…

THE POINT

Preparing the matched experiment
A connected warehouse
SIMULATED
Sorter · central crossingIsometric
Drag to pan · scroll to zoom
Picker High-bay / waiting Bin
Old system / Digital Twin
SHARED CLOCK00:00:00/ 07:24:00
THE NEXT DECISION / THREE SHIFTS300,000 units. 30 positions. One connected day.Daily plans · OMS orders · cross-zone staffing · safety interlocksOpen daily operations ↗
EVIDENCE / ASSUMPTIONS / RESULTS

Know what each number means.

REPORTED

The operator’s starting point

41 PICK/FRAG assignments, 5,497 INNER pieces and 23.8 WMS hours from the supplied aggregate. The operator describes 70 locations, up to 250 pieces and 20–30 empty cartons to cut per assignment.

ASSUMED

The reconstructed operation

Source lines and SKU packs, dimensions, task density, service times, delivery rows and capacity, traffic plan and truck schedule. Original order boundaries are preserved in the Bin comparison. No live WMS feed is connected.

SIMULATED

Event outcomes

Arrivals, confirmations, waiting, recovery, handovers and loads are calculated by the coupled model. The paired systems share demand, labour, equipment and a cutoff. No productivity uplift is prescribed.

What the controller actually does

Released in-zone dispatch; category coverage and dense-work exposure; source visit order; STOP, speed and aisle permissions; original-carrier recovery; compatible delivery-lane choice; high-bay sequencing; wrapper and loading queues.

What the controls establish

Source quantities and running rules are pinned. Operator probes reject unsupported commands. SHA-256 chaining detects edited records relative to the local chain head. A browser owner can replace local code or recompute a chain; production requires authenticated server-side commands and externally anchored, durable audit storage.

What still needs a pilot

Measured geometry and handling times, representative WMS events, approved traffic constraints and an independent validation dataset. Replenishment, fatigue, failures and certified collision avoidance are outside this model. Bonus displays are category threshold checks, not actual payroll awards.

English interface · public engineering demo · illustrative results

SESSION / INPUTS / EVENT OUTCOMES

Your presentation brief.

Review this session before sharing. The document includes each study’s clock, results and reproducible inputs.

Download HTML brief ↓

Text version and reproducible inputs